Navdih pregled Reference Hišni konfigurator Fotomontaža Gradbeni Nasveti
Izdelki pregled Streha Fasada Odvodnjavanje strehe Solarni sistemi Protipoplavna zaščita Trakovi in plošče
Storitve pregled Hišni konfigurator Fotomontaža Naročite brošure Poiščite obrtnike v svoji bližini Naročite garancijski list Vprašanja in odgovori Vaša oseba za stik pri podjetju PREFA Za obdelovalce Za arhitekte
Prednosti pregled Gradbeni material aluminij Posebne teme
Razvoj podjetja pregled O nas Prosta delovna mesta News Mediji
Stik pregled Vaša oseba za stik pri podjetju PREFA Obrazec za stik Naročite brošure Naročite se na novice
Reference pregled Referenčni objekti Najbolj odmevni arhitekturni projekti Galerija slik s primeri obnov z izdelki
Gradbeni Nasveti pregled Sanacija strehe Oblikovanje fasade Fasade iz lesa in aluminija Strešna kritina za vsako obliko strehe Preprosta predstavitev fotovoltaike Opečni videz
Za obdelovalce pregled Akademija Usposabljanje iz polaganja: podpora na terenu Smernice za montažo & Navodila za montažo Videoposnetki z navodili in predstavitvami Promocijska gradiva, logotipi in vzorci izdelkov
Za arhitekte pregled Doživite PREFARENZEN Naročite knjigo o arhitekturi in mapo za arhitekte Središče za prenose BIM
Gradbeni material aluminij pregled 40 let garancije Trajnost Celovit sistem Odpornost proti vetru
Posebne teme pregled Protipožarna zaščita Spomeniško varstvo
O nas pregled Družinsko podjetje PREFA Naše vrednote in cilji Trajnost
The construction, operation, maintenance and repair of a photovoltaic system requires in-depth expertise. Therefore, all work may only be performed by appropriately qualified and authorised skilled workers.
The PREFA installation instructions contain general guidelines which must also be adapted to the local, national and location-specific construction regulations, standards and environmental regulations. Occupational health and safety precautions, as well as all accompanying standards and trade association guidelines must be observed.
When transporting PREFA materials, handle the packing units carefully. Secure open units or sheet metal parts against falling in strong winds. Protect cardboard packaging stored on the roof against the rain. The structural-physical requirements must be taken into account. Impurities such as drilling dust or mortar residues on coated or bare aluminium parts must be removed immediately. Where photovoltaic systems are installed on PREFA roofs, an agreement about snow protection measures should be reached with the owner depending on the prevailing snow load. Follow the solar panel manufacturer’s installation instructions. The potential equalization between the individual system sections and the connection to a lightning protection device must be carried out according to the respective national guidelines. In the event of non-compliance with, or disregard of, the installation guidelines or failure to use all system components, PREFA shall assume no liability for any defects or damage arising therefrom. The load-bearing capacity of the PREFA mounting system as well as that of the supporting structure must be verified by structural calculations. PREFA provides structural verifications for the mounting system based on a preliminary design. For applications that deviate from this preliminary design, a project-specific calculation by a certified structural engineer is required.
Note
A static design or inspection in combination with sub-structure framework components from other providers is not performed by PREFA.
The system installer is responsible for the professional and standard-compliant design, as well as for compliance with the product structure.